Product Overview
Meilijia Gold Diamond Ruyi Stone is a high-end architectural coating that mimics the appearance of natural stone, composed primarily of emulsion, natural colored sand, and additives. This product seamlessly combines the luxurious texture of natural stone with the lightweight advantages of architectural coatings, offering a premium decorative solution for modern building exteriors that balances aesthetic appeal, safety, and cost-effectiveness.
Product Features
- The transparency of color stems from the stone’s superiority over other stones.
- Natural colored sand that never fades.
- Top-tier, prestigious raw crystal chips
- Stain-resistant, durable, and exceptionally weather-resistant
- Energy-saving, environmentally friendly, and lightweight
Scope of Use
Widely used in various types of residential buildings (high-rise apartments, villas, and condominiums), commercial properties (office towers, hotels, and shopping malls), and public facilities (schools and hospitals), this product easily adheres to a variety of substrates, including concrete walls, insulation layers, and metal panels. It is particularly well-suited for renovation projects on existing buildings, as it eliminates the need to remove existing tiles or coatings, thereby significantly reducing costs and construction time.
How to Use
Product Use: Open the lid and use immediately. If slight layering occurs, simply tilt the container back and forth or stir slowly.
Construction tool: Pressure spray gun specially designed for multi-color stone-effect coatings
Key Points for Spraying
Standard texture – 2 coats of spray painting
Step 1: Normal atmospheric pressure, with a consumption rate of 1.2 kg/㎡.
Question 2: Normal atmospheric pressure, with a consumption rate of 1.2 kg/㎡.
Superb texture—three coats of spray painting
Step 1: Normal atmospheric pressure, with a consumption rate of 1.0 kg/㎡.
Question 2: Normal atmospheric pressure, with a consumption rate of 0.8 kg/㎡.
Question 3: Normal atmospheric pressure, with a consumption rate of 0.6 kg/㎡.
Specification Standards
Product specifications: See the product certificate of conformity.
Color adjustment: Adjustable
Implementation Standard: GB/T 9755-2024
Construction System
Construction Procedures |
Product |
Construction Method |
Recommended number of coats (Tao) |
Theoretical consumption (kg/㎡)
|
Grassroots |
Grassroots inspection |
-
|
-
|
-
|
Primer layer |
Meilijia Dedicated Primer |
Spray coating or roller coating |
1
|
0.1–0.12
|
Intermediate Coating |
Meilijia Colored Intermediate Coat |
Spray coating or roller coating |
1
|
0.2–0.25
|
Main Material Layer |
Meilijia Golden Diamond Ruyi Stone |
Spraying |
2
|
2–2.5
|
Topcoat layer |
Meilijia Special Facial Oil |
Spray coating or roller coating |
2
|
0.2–0.25
|
Precautions
- To ensure optimal wall coating performance, it is strongly recommended to use this product in conjunction with the Meilijia complementary system; mixing this product with products from other brands is strictly prohibited.
- Prior to construction, the substrate must be thoroughly inspected, including checks for hollow sounds, surface flatness, pH, and moisture content. The ambient temperature should be no lower than 5°C, and relative humidity should not exceed 85% (construction is not recommended in rainy, snowy, or extremely hot weather). Smooth surfaces such as concrete walls, Roman columns, and inverted slabs must be roughened using Meilijia two-component interface agent.
- After applying the crack-resistant mortar, it must be cured by water spraying for 3 to 7 days, twice daily—once in the morning and once in the evening. The hydration reaction of the mortar requires a continuous supply of moisture; insufficient curing can result in inadequate mortar hardness, surface drying shrinkage and cracking, sanding and pulverization, and, in the later stages, a high likelihood of delamination, spalling, and other quality problems.
- Construction must strictly adhere to standard application procedures and coating density requirements. The main material for applying the stone-imitation paint must be applied using a dedicated spray gun, and prior to spraying the color flecks, It is best to pour the two buckets back and forth 2–3 times; do not stir vigorously. First, Adjust the pressure and conduct a test spray with the spray gun. Conduct spray-applied sample tests, and proceed with full-scale application only after the test results are satisfactory.
- During construction, implement appropriate protective measures to prevent skin and eye contact with the product.
- Construction requirements stipulate that the next process may only be carried out after the preceding process has completely dried; in particular, the color-dot coating must be thoroughly dried and achieve the specified hardness before topcoating can be applied.
- Paint consumption varies depending on the roughness of the actual施工 surface and the dilution ratio.
- The degree of product drying is influenced by ambient temperature, humidity, and ventilation. At room temperature, drying typically takes 6–8 hours; in winter or during humid weather, the drying time should be appropriately extended.
- Keep out of reach of children;
- Storage: 12 months (store in a sealed container in a cool, dry place);
- Transportation: This product is not a hazardous chemical and may be transported as ordinary cargo.
- For the product’s implementation standards, batch number, date of manufacture, inspector, and shelf life, please refer to the Certificate of Conformity.
Keywords:
Golden Diamond Auspicious Stone
RELATED PRODUCTS
There is no relevant data for the time being, please add it backstage!